What is Modular Residential House
OML provides assembled modular timber frame modules. By producing highly integrated prefabricated wall panels, floor panels, and roof panels on automated assembly lines in China, we greatly improve the construction efficiency of local workers, which reduces project costs and saves time.
Product By Styles
OML has many styles of granny houses and we also have a team of designers who can customize your house to fit your needs.
Material Certification for OML




How we build the house?
OML Modular started the service from the conceptual design of the user and provided a full set of project construction design drawings, material procurement, factory production, transportation of prefabricated modular house, and project site erection, a total of 4 months to complete the delivery of a 150 square meters townhouse.

Our Fully Automated Production Line.
OML Modular adopts the automated production model of assembly line robotic arms and produces modular houses 24 hours a day through unmanned factories, greatly reducing production costs and improving production efficiency.
Frequently Asked Questions by Our Customers
The pipes and wires inside the wall are pre-buried in advance, and the wires are quickly connected through aviation plugs, which improves the assembly efficiency at the project site.
Our plant can produce an average of 30 standard walls per day, which is enough to build a home with 1,500 square feet of floor space. Our production capacity is 300 homes (1,500 square feet) per year.
Pricing varies from product to product and is quoted based on the customer’s needs.
The base price for our townhouses is AUD 800 per square meter. Prices will increase depending on the customization needs of the customer.
Modular homes are built quickly – it usually takes about 10-13 weeks from the time construction begins at the factory to the time you move in. This timeframe includes less than 4 weeks for material procurement, less than 4 weeks for production, less than 3 weeks for shipping, and less than 2 weeks for project site erection (4-person erection).
All of our products have passed 3 times quality qualification tests to the level of Australian standard certification. If problems occur in rare cases, we will provide door-to-door service by our local team. Solve all kinds of problems encountered by users.